Pinnacle-systems DR Bedienungsanleitung Seite 26

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 48
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 25
19
Installation Procedures
DIN-rail Controller Module
Controller Module Setup
Internal jumpers inside the Controller Module allow for
selection of pylon length (height of tower itself). Table
6 demonstrates how to set the internal jumpers if you
wish to use the Controller Module with a set of pylons
that are a different length.
EXT Activates External Relay Checking function
(see Standard Features, “External Relay
Check”).
FLASH Increases immunity to weld ash by slowing
down the curtain (doubles response time).
CLOSE Activates Latching Relay Reset feature (see
Standard Features, “Resettable Latching
Relays”).
AB/FLT Selects either Auto Blank or Floating Blank
(jumper = Auto Blank).
Figure 4: Internal Circuit Board View
Table 6: Internal Jumper Settings with Different Pylon Lengths
16
Installation Procedures
DIN-rail Controller Module
4" 8" 12" 16" 20" 24" 28" 32" 36" 40" 44" 48" 52" 56" 60" 64"
L011111111
L1 11 11 11 11
L2 1111 1111
L3 11111111
L4 1111111111111111
68" 72" 76" 80" 84" 88" 92" 96" 100" 104" 108" 112" 116" 120"
L01111111
L1 11 11 11 11
L2 1111 1111
L3 11111111
L4
1 = Jumper
For pylons with 1” beam spacing, install the Jumper plug (just below L0)
For pylons with 1/2” beam spacing, remove the Jumper plug (just below L0)
Seitenansicht 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 47 48

Kommentare zu diesen Handbüchern

Keine Kommentare